Illinois Railway Museum Home Page
 
 Shay #5 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Tubes prepared in the firebox
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Tubes prepared in the smokebox
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Stay heads completed
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Starting to fit the bottom
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Tubes prepared in the firebox - Nigel Bennett (nbennett)
Viewed: 591 times.
Tubes prepared in the smokebox - Nigel Bennett (nbennett)
Viewed: 598 times.
Stay heads completed - Nigel Bennett (nbennett)
Viewed: 639 times.
Starting to fit the bottom - Nigel Bennett (nbennett)
Viewed: 587 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Critical adjustment
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Smokebox ring drilled for rivets
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Back rivets still to drill
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Lifting the throttle into place
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Critical adjustment - Nigel Bennett (nbennett)
Viewed: 627 times.
Smokebox ring drilled for rivets - Nigel Bennett (nbennett)
Viewed: 574 times.
Back rivets still to drill - Nigel Bennett (nbennett)
Viewed: 597 times.
Lifting the throttle into place - Nigel Bennett (nbennett)
Viewed: 606 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Brian prepares the dome
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Threading the needle
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Careful control from the forklift
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Fittings installed on backhead
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Brian prepares the dome - Nigel Bennett (nbennett)
Viewed: 527 times.
Threading the needle - Nigel Bennett (nbennett)
Viewed: 584 times.
Careful control from the forklift - Nigel Bennett (nbennett)
Viewed: 545 times.
Fittings installed on backhead - Nigel Bennett (nbennett)
Viewed: 566 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Water in the glass
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Full into the dome
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Bucking the staybolt
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Forming the head
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Water in the glass - Nigel Bennett (nbennett)
Viewed: 561 times.
Full into the dome - Nigel Bennett (nbennett)
Viewed: 605 times.
Bucking the staybolt - Nigel Bennett (nbennett)
Viewed: 554 times.
Forming the head - Nigel Bennett (nbennett)
Viewed: 547 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Progress on the backhead
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Warming the boiler for hydro
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Support for riveting
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
No Caption
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Progress on the backhead - Nigel Bennett (nbennett)
Viewed: 601 times.
Warming the boiler for hydro - Nigel Bennett (nbennett)
Viewed: 600 times.
Support for riveting - Nigel Bennett (nbennett)
Viewed: 550 times.
- Nigel Bennett (nbennett)
Viewed: 560 times.
Powered by Gallery.
Copyright © 1995-2020, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM