The smokebox is now ready for new bolts - Nigel Bennett (nbennett) Viewed: 905 times.
|
All flexi stays to be tseted are now marked - Nigel Bennett (nbennett) Viewed: 851 times.
|
Debris collects in the socket of the stay - Nigel Bennett (nbennett) Viewed: 890 times.
|
So the socket must be cleaned before testing - Nigel Bennett (nbennett) Viewed: 852 times.
|
| | | |
| | | |
|
|
|
|
Superheater element bolts before - Nigel Bennett (nbennett) Viewed: 826 times.
|
and after cleaning and checking - Nigel Bennett (nbennett) Viewed: 853 times.
|
Glenn turns the taper on a safe end - Nigel Bennett (nbennett) Viewed: 848 times.
|
Ed works on the new lubricator piping - Nigel Bennett (nbennett) Viewed: 814 times.
|
| | | |
| | | |
|
|
|
|
First two flues now safe ended - Nigel Bennett (nbennett) Viewed: 806 times.
|
Motion brackets now cleaned for repainting - Nigel Bennett (nbennett) Viewed: 854 times.
|
Cylinders now well under way - Nigel Bennett (nbennett) Viewed: 824 times.
|
Boiler insulation stored ready to install - Nigel Bennett (nbennett) Viewed: 825 times.
|
| | | |
| | | |
|
|
|
|
Test patch reinforced for bending - Nigel Bennett (nbennett) Viewed: 837 times.
|
Setting the patch in the press - Nigel Bennett (nbennett) Viewed: 843 times.
|
Fetching the first new tubes into the shop - Nigel Bennett (nbennett) Viewed: 800 times.
|
Swaging set up ready to go - Nigel Bennett (nbennett) Viewed: 837 times.
|
| | | |
| | | |
|
|
|
|
First 24 new tubes now swaged - Nigel Bennett (nbennett) Viewed: 824 times.
|
Swaging area now in full use - Nigel Bennett (nbennett) Viewed: 814 times.
|
New pipework in place along the boiler - Nigel Bennett (nbennett) Viewed: 845 times.
|
Set up for cutting ferrules - Nigel Bennett (nbennett) Viewed: 855 times.
|
| | | |