Crown sheet showing stays and front seam - Nigel Bennett (nbennett) Viewed: 1244 times.
|
Firebox side stays - Nigel Bennett (nbennett) Viewed: 1153 times.
|
Removing top of the dome - First slide onto pallet - Nigel Bennett (nbennett) Viewed: 1169 times.
|
Removing top of the dome - The gently lower - Nigel Bennett (nbennett) Viewed: 1110 times.
|
| | | |
| | | |
|
|
|
|
The dome cover - a pretty solid lump of steel - Nigel Bennett (nbennett) Viewed: 1096 times.
|
Brian needle chipping the firebox - Nigel Bennett (nbennett) Viewed: 1128 times.
|
Pipework to be tested - Nigel Bennett (nbennett) Viewed: 1086 times.
|
Firebox seam after sand blasting - Nigel Bennett (nbennett) Viewed: 1123 times.
|
| | | |
| | | |
|
|
|
|
First test bending of the patch - Nigel Bennett (nbennett) Viewed: 1025 times.
|
Rigged for sand blasting - Nigel Bennett (nbennett) Viewed: 1090 times.
|
Sand blasting in progress - Nigel Bennett (nbennett) Viewed: 1082 times.
|
Collin emerges from the boiler - Nigel Bennett (nbennett) Viewed: 1051 times.
|
| | | |
| | | |
|
|
|
|
Rear boiler course now cleaned - Nigel Bennett (nbennett) Viewed: 1116 times.
|
Front tube sheet sheathed for cleaning - Nigel Bennett (nbennett) Viewed: 1114 times.
|
Tubes as recieved back from sand blasting - Nigel Bennett (nbennett) Viewed: 1014 times.
|
Tubes coated with Apexior - Nigel Bennett (nbennett) Viewed: 1054 times.
|
| | | |
| | | |
|
|
|
|
Tube end clean cut for refitting - Nigel Bennett (nbennett) Viewed: 1037 times.
|
Super heater flues still to be clean cut - Nigel Bennett (nbennett) Viewed: 1052 times.
|
Flues now ready for safe ending - Nigel Bennett (nbennett) Viewed: 1038 times.
|
Sand removal - Not pretty but it works! - Nigel Bennett (nbennett) Viewed: 1059 times.
|
| | | |